SERVICES / CSV AND GXP VALIDATION

CSV and GxP validation

Validation of computerised systems in pharmaceutical, biotech and medical device environments: LIMS, MES, ERP, QMS, laboratory instruments and cloud platforms.
GAMP 5 · EU ANNEX 11 · 21 CFR PART 11 · FDA CSA · ICH Q10

What we do

We lead validation projects from user requirements to inspection, and we take over projects that have stalled. Validation projects rarely fail on technical knowledge. More often the review cycles were never planned realistically, QA was involved too late, or traceability was put together at the end. Much of our work is preventing those three problems.

What we deliver
Validation plan; risk assessment under GAMP 5 or FDA CSA; user requirements (URS) and their traceability; installation, operational and performance qualification (IQ / OQ / PQ) scripts and evidence; deviation management; validation summary report; requirements traceability matrix (RTM).
Optional additions
Gap assessment against 21 CFR Part 11 (FDA rules for electronic records and signatures) and EU Annex 11; data integrity assessment; periodic review programme; independent QA review for separation of duties.
Who we work with
Heads of Quality, Heads of Validation and IT / OT leads in pharma, CDMOs, biotech and medical devices, and quality leads at GxP software vendors preparing for a customer audit or supplier qualification.

How we engage

Readiness review

A fixed-scope review of where you stand against the regulation or standard, with a written report and a plan. Usually 2 to 4 weeks, at a fixed price.

Project or interim lead

A senior consultant leads the work inside your organisation for the length of the project, typically 3 to 9 months.

Recovery of a project in progress

We assess where a delayed project really stands, agree a realistic plan with leadership, and lead it to completion.

Support between audits

Periodic reviews, evidence kept up to date, and preparation for the next audit or inspection.

REGULATORY CHANGES. FDA has finalised its Computer Software Assurance guidance, and the EU is revising Annex 11 and adding Annex 22 on AI. Read our article on what is final and what is still a draft →

The validation workstream

Validation runs as one workstream of the program plan. In this example, each specification on the left of the V is tested by a qualification step on the right: URS by PQ, FS by OQ and DS by IQ. The traceability matrix records these links. Hover or tap URS, FS, DS, IQ, OQ or PQ to highlight its link.

Validation workstream on the program timelineEXAMPLE
Validation workstreamTraceabilitySwipe to see all 12 months

How we run validation projects

We run validation projects on our own proprietary methodology. If your organisation already has a project or validation methodology, we are glad to work within it and adapt our tools to fit.

Our methodology gives every project a charter, a phased schedule with entry and exit criteria, a risk register adapted to validation, and a decision log.

It also includes a document template, with its own review checklist, for each document in the V-model, the standard sequence of specification and test documents:

VPValidation plan
URSUser requirements
FSFunctional specification
DSDesign specification
IQInstallation qualification
OQOperational qualification
PQPerformance qualification
RTMRequirements traceability matrix
VSRValidation summary report
  • A realistic timeline, agreed early and revised openly when it needs to change
  • An internal review of every document before it goes to formal QA review
  • QA involved from the start, with acceptance criteria agreed before the work begins
  • Traceability kept current, so untested requirements are found while there is time to act

Related: the article why validation programs slip.

Projects we led

Examples of validation and GxP projects led by members of our team in pharmaceutical and other regulated organisations. They are a selection, not a complete list.

LARGE PHARMA  ·  ABOUT 11 MONTHS

A validated laboratory workflow platform for human ADME studies

A custom platform for studies of how the body absorbs, distributes, metabolises and excretes a drug (ADME), analysed by accelerator mass spectrometry. Built and validated under GAMP 5, with 127 formal test cases.

Outcome: live in production after 11 months; the final QA audit observations closed within two days.

PROGRAM LEADERSHIP · CSV · GAMP 5
LARGE PHARMA  ·  ABOUT 12 MONTHS

Closing GxP audit findings on a clinical data platform

A program to complete 32 corrective and preventive actions (CAPAs) from internal GxP audits on a validated platform for clinical bioanalytical data. The remediation ran as one program in five workstreams, each with one accountable owner.

Outcome: all CAPAs closed, the last and most complex by its due date.

PROGRAM LEADERSHIP · CAPA
HEALTHCARE SPIN-OFF  ·  TEAM OF ABOUT 40

A public cloud service for a corporate spin-off

AWS and Azure landing zones, the engineering and support teams to run them, governance, and a service catalogue in which each provider service was evaluated and qualified for GxP use.

Outcome: the new company received a public cloud service of its own.

PROJECT LEADERSHIP · CLOUD · GXP

A SELECTION, NOT A COMPLETE LIST · DELIVERED BY MEMBERS OF THE SCALANTO TEAM · REFERENCES ON REQUEST

Questions clients ask

Is GAMP 5 a regulation?

No. GAMP 5 is industry guidance published by ISPE. It describes a risk-based approach to validating computerised systems. The requirements come from the regulators: in the EU, Annex 11 of the EU GMP guidelines covers computerised systems; in the US, 21 CFR Part 11 covers electronic records and signatures where it applies.

Does the FDA Computer Software Assurance guidance apply to us?

The guidance is not binding. It covers software used as part of medical device production or the quality system. Pharmaceutical companies may still use its risk-based approach to testing when they scope validation work. Our article on CSV regulation in transition explains what is final and what is still a draft.

Which systems do you validate?

LIMS, MES, ERP, QMS, laboratory instruments and cloud platforms, in pharmaceutical, biotech and medical device environments.

What does a readiness review give us?

A written report on where you stand against the regulation or standard, and a plan to close the gaps. It usually takes 2 to 4 weeks and has a fixed price.

Can you take over a validation project that is already running?

Yes. We assess the current status of the project, agree a realistic plan with leadership, and lead it to completion.

Can you work within our validation procedures?

Yes. If your organisation already has a project or validation methodology, we work within it and adapt our tools to fit.

Discuss a validation project

Write to us with a few lines about the system, how it is used in GxP work and the date you are working towards. The first conversation is with a senior consultant, and we will tell you plainly whether and how we can help.

  1. A free first call with the consultant who would lead the work, usually 30 minutes.
  2. If a first engagement fits, a written proposal for a readiness review or project leadership, with a defined scope and price.
  3. The work starts once you accept the proposal.